Garage Project
September 4, 2004 - Winter 2007

4 Phase Project




Phase 1 - Electrical
September 4, 2004 - September 6 2004
1 - 100 Sub-panel with 4 20 Amp Breakers
2 - 100 Watt Garage Attic Lights - own circuit
2 - 40 Watt Wall mounted Flour. Lights - own circuit
4 - 40 Watt Ceiling mounted Flour. Lights - own circuit
9 - 20 Amp Outlets on 3 walls and ceiling
01.JPG (1513528 bytes) 02.JPG (104418 bytes)

03.JPG (83446 bytes) 04.JPG (95163 bytes)

Phase 2

Completed April 2005
Insulation: R19 in ceilings & R11 in walls
Drywall: Ceiling & upper 4 feet of wall
Paint: "Phantom Lake" by JC Licht
Shelving in attic not pictured

05.JPG (1588076 bytes) 06.JPG (1662361 bytes)

Phase 3

Completed Spring  2006
Dug and buried 220v line - 8 gauge 50amp circuit - 120' pull
Wood Paneling up (done expertly by Danny & Ryan)
Sealed all Wood Paneling after winter
Cedar Baseboard & Shelving sealed and installed 


07.JPG (604558 bytes) 08.JPG (623636 bytes)

having the wood paneling completely removable has come in very handy and I would highly recommend this type of wall finishing be done because it aids in cleaning and or adding electric (ie for the garage heater, which was installed winter '07)
09.JPG (1785021 bytes)