Basement Project
January 2008 - March 2008

Phase 1



Paint Rafters Black
Removed old drywall on upper half of breast wall
Removed loose plaster
Cleaned walls
Remove old ash-catch
Insulated studs

 01.JPG (4304935 bytes) 02.JPG (6607624 bytes)

cleaned up walls with Clorox

03.JPG (4324184 bytes) 04.JPG (4367446 bytes)

nasty stuff removing ash and debris, found chicken bones in debris
asphalt patched the resulting

05.JPG (4514924 bytes) 07.JPG (3941559 bytes)
 

note old positions of lighting & outlets


06.JPG (4118598 bytes) 

Pressure treated base-boards
 

Phase 2

Nearly Completed March 1, 2008
ran new 1/2" line to post
currently 15 amp breaker
#12 wire

circuits:
1 - Lights on N. Side
2 - Lights on S. Side
3 - outlets

08.JPG (4376197 bytes)  09.JPG (4148446 bytes)

10.JPG (4823123 bytes)

after 4 trips to Home Depot because of missing parts/broken balasts/wrong fixture/etc, still have to add one more double 4' light between the two lights above 

Phase 3

thru 3.16.08

Spray Paint upper portion of studs and areas of old electrical lines, boxes, and lights
bolt down studs to floor
... and then Drywall 

 11.JPG (1591715 bytes) 12.JPG (1647100 bytes)

above left: got some 'big' gaps to fill!

above right: lot of mudding going to be necessary in the upper-left portion of the pic

13.JPG (1713302 bytes) 14.JPG (1548784 bytes)


 Phase 4

Mud, Prime & Paint!